Projects

EL PASO WATER UTILITIES LIME RE-CARBONATION

image4

  

Provided EI&C design, construction, installation and integration of a complete control system to convert the existing generators to digester fuel. Included in the project was relay coordination and generator synchronization of a 1.2MW generating plant. RTU panel design and build, installation and programming of system, instruments procurement and installation.

METRO WATER DISTRICT ARC FLASH HAZARD ANALYSIS

image5

  

Provided coordination, electrical engineering and field services for 23 remote well, booster stations and water treatment plants. The project included comparison of design engineering drawings with contractor installation, calculation of incident energy based on recommended breaker settings, updating electrical equipment with identification labeling to meet arc flash requirements and equipment tagging.

ARIZONA WATER CO. ELECTRICAL SITE UPGRADES

image6

  

Provided EI&C design and construction oversight in a design build application working with AWC and contractor to change out the electrical gear and RTU application for a number of well and booster station sites. Canfield visited the sites, provided a survey, assessed electrical equipment from utility connection through power and control distribution. Provided construction documents for permitting, and construction. Final inspection was provided in order to turn power on to the site and record drawings were provided to AWC.

PIMA COUNTY ROGER ROAD GEN CONTROLS UPGRADE

image7

Provided EI&C design, construction, installation and integration of a complete control system to convert the existing generators to digester fuel. Included in the project was relay coordination and generator synchronization of a 1.2MW generating plant. RTU panel design and build, installation and programming of system, instruments procurement and installation.

BELLA VISTA WATER CO REMOTE SCADA UPGRADE

image8

  Provided EI&C design, construction, installation and integration of a complete SCADA system to connect 10 remote water sites, via RTU/PLC, to a main HMI.